Strong Wind will be in charge of the engineering, procurement, and construction of the FPU that will be deployed at the Madura field in Indonesia, which is being built jointly by Husky, CNOOC, and Madura.
ABS will classify the unit, and delivery is expected in June 2022.
Jiangsu Strong Wind was established in 2016 and specializes in the construction of offshore equipment.
Maritime Business World