"Steam will be delivered by our MCS combined steam boiler utilizing the exhaust heat and is equipped with an MDO atomizing burner. Parat will also deliver an MVH oil-fired smoke tube boiler for hot water," Parat stated.
A feed water tank, water treatment, heat exchangers, hot water boiler, pumps, and surplus steam dumping system will be supplied to the system.
The steam system will be used for the loading of trawlers and the central heating system will be used for the MVH Hot Water Boiler. In 2021, the boilers are scheduled for delivery.
The Arctic Freezer Trawler, designed at the Tersan Shipyard in Turkey, is a Skipsteknisk ST-119 model and will be delivered to PF Havborg in 2022.
Maritime Business World